8.14.2010

drywall

last weekend chad and his dad cut the drywall for the baby and spare bedroom:


today my brother, chad and i hung the drywall:

before:

after:

after this weekend i'll have pics of a more complete drywall job.

last weekend i finally finished removing the glue from the baby room closet:

before:

after removing glue:


meanwhile baby is getting closer.  this is me, 31 weeks.  we started our baby classes.  i've had two showers (out of 3 or 4) and we're getting closer to receiving the baby supplies we (think) we'll need.  i just need to find a place to organize it all while the baby room is being finished!



things are moving along.  hopefully paint, floor refinishing, and the bathroom/plumbing will happen soon.  keep you fingers crossed.  till next time!!

6.30.2010

end of june progress report

so here we are.  the last day of june.  fifteen weeks left until our little bundle of joy is set to join us here at irvington bungalow.  and where are we in the progress of work on this old house?  read on, my friends.

bathroom - we received the tile sample for the floor. 


this is the design and basically the colors. we put white pieces of paper over the gray colored tile the tile guy suggested we use (you can see it in the top row of the whole sample).  the picture on the right shows a hex shaped tile but that is just to portray the actual shade of white that the tile will be (since the paper was a bright, stark white).

in the next couple of days we'll order the tile. so excited and a bit apprehensive as this guy has been taking FOREVER to get back to us about anything.  so annoying.  but i'm trying to be optimistic that once he has a down payment, things will move more smoothly???  maybe???  hopefully!!

air conditioner - did i mention our A/C unit went out a few weeks ago?  yes, it has been a fun challenge to add that huge project to our list completely unexpectedly.  after four quotes, we finally found a wonderful contractor who helped us out and temporarily fixed the problem for us because it turned so hot outside.  we're getting a whole new HVAC system installed within the next week.  so excited.  complete with duct work to the attic and basement which will one day be finished out for living space.


chad poured a new concrete slab where the new unit will go.  he is so proud (and so am i).  it looks great!

and that's about all that has happened since the last time i wrote.  things are moving forward, faster than they probably have up until this point.  from here on out it will be a whirlwind until the baby is due.  here is my wish list, not in the correct order:

walls painted in the whole house
floors refinished in the whole house
nursery finished (new drywall installed and paint)
guest bedroom finished (new drywall installed and paint)
wood blinds purchased and installed in the bedrooms
new HVAC
new bathroom
new plumbing

we can get this done in 15 weeks.  right???  hahahahaha...........

till next time.

4.12.2010

another one bites the (plaster) dust

it was only a matter of time.  about two weeks ago chad asked if a crack in the ceiling in our bedroom was more pronounced than it had been.  i brushed it aside.  then a few days later, i said, i think you're right.  our ceiling might fall down.  both of those admissions were difficult for me.
saturday morning i was laying leisurly in bed, staring at the ceiling because if i'm not sleeping, what the hell else am i looking at?  and i noticed that LITERALLY a portion of the ceiling might fall at any second.
so later that day a portion of the ceiling came down (chad helped it along).  sometime this summer drywall will be installed.  at least it matches our other bedroom now {silver lining}.



9.12.2009

guest bedroom

last weekend chad's best friend and his wife came to visit. which meant we had to get the guest bedroom in working order. there is no plaster on two of the walls in our guest bedroom - only exposed lath. we bought drywall to finish off the parts with no plaster about four months ago. too bad by last weekend the drywall (some 12' long) were still sitting in the same place - blocking access to the bed. i suggested just setting the Little Giant next to the drywall so they could climb the ladder over the drywall and into the bed. chad did not think this was funny.

instead we just moved it to the side wall, cleared out the tools and the baseboards, and cleaned.
and you know what? our guests didn't complain (not to our faces anyways).

the other (*sigh*) issue about staying at our house is the fact that our bathroom still hasn't been renovated. we have to turn the toilet on and off at the valve in order to flush. poor guests. i had to leave them this note on how to use the toilet. JUST the thing you want to see after a long flight. haha!